Send a job
  1. Home
  2. Guides
  3. How to sketch for a quote

Guide · 4 minute read

How to sketch windows for a quote that comes back right first time

A hand sketch on the back of a survey sheet is all we need to price a job. These are the five things that make the difference between a price tomorrow and a round of questions first.

A sketch we can priceAll sizes in mm

A window sketch with everything needed for a priceA two-pane window 1500 millimetres wide and 1500 high, viewed from outside. The left pane opens and is marked with a triangle pointing to its hinges; the right pane is fixed.VIEWED FROM OUTSIDE15001500LEFT OPENS · HINGED LEFT · RIGHT FIXED
1500 × 1500 · left opens, hinged left · right fixed · viewed from outside

The five things

What every sketch needs

  1. Width × height in millimetres

    On every frame, width first. Overall sizes are fine: just say whether they are frame sizes or opening sizes.

  2. Drawn as seen from outside

    Left and right always mean left and right as you stand outside looking at the building. It's the most common reason a frame comes back handed the wrong way.

  3. Which panes open, and where the hinges are

    Draw a triangle in each opening pane with its point at the hinge side. Leave fixed panes empty. For tilt-and-turn, add a second triangle pointing down.

  4. Bays and couplings

    Write each frame's width along the top and the angle of the bay (often 135° or 90° corners). Say if the frames are coupled in the factory or fitted as separate frames on site.

  5. The room, and anything the regs need

    Write the room on each frame. A first-floor bedroom may need an escape window, a bathroom obscure glass, a low pane or a door toughened glass. Tick them on the job sheet and we price them in.

Spec

The spec, once for the whole job

You don't need to repeat the spec on every frame. The job sheet asks four questions once:

  • Material: aluminium or uPVC, or mixed (mark which on the sketch).
  • Glazing: double or triple.
  • Colour: outside and inside, as a RAL number or a foil name. Anthracite grey RAL 7016 outside with white inside is a popular choice.
  • Opening: outward like a UK casement, or inward tilt-and-turn, which is often the lower price.

If one frame is different, write it on that frame: "this one triple", "this one opens in".

Measure

Sizes for the price, survey for the order

For the price, sizes to the nearest 10 mm are enough. Before you order, survey every opening properly: we make every frame to your final survey sizes, and a frame made to a rough sketch size is a frame that doesn't fit.

No tape on you? The QuoteToFit measuring app gives width and height from one photo with a sheet of A4 taped to the glass. It's for quoting, not ordering.

Questions

Questions builders ask

Is a photo of a hand sketch really enough?

Yes, if the sizes are readable. Take the photo square-on in good light. If anything is unclear, we ask before we price.

Frame size or opening size?

Either, as long as you say which. The price is close enough either way; the exact frame sizes come from your survey before you order.

How do I show a tilt-and-turn window?

Two triangles in the pane: one pointing to the hinge side for the turn, one pointing down for the tilt. Or just write "T&T" on it.

Can I send several sketches for one job?

Yes, up to 8 photos on the job sheet. Put a job reference on it so every sketch lands on the same price.

Send the sketch. We'll do the pricing.

Photo of the sketch, four ticks, your postcode. Trade price with delivery within one working day.

Send a job