Send a job
  1. Home
  2. Guides
  3. Saving time on quotes

Guide · Quoting

What a window quote really costs you and how to quote faster

Quoting windows and doors is unpaid work: the visit, the drawing, chasing a supplier price, typing it up. Here is how to put a number on it for your own business, and five ways to cut it.

For
Builders and installers
Read
4 minutes
You need
Your own numbers

Cost

Work out what one quote costs you

Two numbers decide it: how long one quote takes from survey to sending, and how many quotes you send for every job you win.

Your numbersExample
Hours per quote (visit, drawing, supplier price, write-up)3 hours
Quotes sent per job won4
Unpaid hours behind each job you win3 × 4 = 12 hours
At your hourly rate, e.g. £4012 × £40 = £480 per job won

The example figures are for illustration; put in your own. Most of that time is spent on jobs you never get.

Five ways

Five ways to quote faster

  1. Price from a photo before you drive out. A homeowner's photo with a sheet of paper on the glass gives sizes close enough to quote. Measure properly only when the job is likely. Our free measuring app does this on a phone.
  2. Fix four spec questions. Material, double or triple, colour outside and inside, opening in or out. Most of the back-and-forth on a quote is one of these.
  3. Send one delivered price. A supplier price without delivery is a second phone call. Ask for one figure, delivered to site.
  4. Hand the pricing over. Send the sketch to a supplier who prices it and returns a quote in your name. That is what our quotes for installers do.
  5. Follow up once, on day two. A quote that lands while the customer is still comparing gets read.

Sketch

What a good sketch needs

  • Width × height on every frame, in mm, and whether it is the frame or the opening.
  • Every opening sash drawn as seen from outside, with the hinge side.
  • Room names, so bathrooms get obscure glass and doors get safety glass.

Full walk-through: how to sketch windows and doors for a quote.

FAQ

Questions builders ask

How long should a window quote take?

That depends on the job, but a quote that waits more than a few days for a supplier price is usually the one that loses. Pricing from a sketch removes the longest wait.

Is a photo accurate enough to quote from?

For a quote, yes, if a known size such as a sheet of paper is in the photo. For ordering, no: measure on site before you confirm.

Can a supplier send the quote in my name?

Yes. We send a customer quote with your logo and your margin, free for trade accounts that order.